2019-18 |
APPROVING A BOAT DOCK EXTENSION AT LOT 17, BLOCK 5, & LOT 1, BLOCK 6, OLD MARCO VILLAGE, PLAT BOOK 6, PAGE 3, PUBLIC RECORDS OF COLLIER COUNTY, FLORIDA, 1066 RUPPERT ROAD AS PROVIDED IN SECTION 54-115 OF THE LAND DEVELOPMENT CODE |
Fri 3/1/19 |
Link |
2019-17 |
APPROVING A FOUR & ONE-HALF FOOT ENCROACHMENT INTO THE WEST SEVEN & ONE-HALF FOOT RIPARIAN SETBACK AT LOT 17, BLOCK 5, & LOT 1, BLOCK 6, OLD MARCO VILLAGE, PLAT BOOK 6, PAGE 3, 1066 RUPPERT RD, AS PROVIDED IN SECTION 54-115 OF THE LAND DEVELOPMENT CODE |
Fri 3/1/19 |
Link |
2019-16 |
APPROVING AND DESIGNATING THE CITY MANAGER AS THE AUTHORIZED AGENT HAVING SIGNATURE AUTHORITY FOR THE EXECUTION OF FEDERALLY FUNDED SUBAWARD AND GRANT AGREEMENTS FOR HURRICANE IRMA DR-4337 (FL) OBLIGATED FEMA PUBLIC ASSISTANCE PROJECTS |
Mon 3/4/19 |
Link |
2019-15 |
APPROVING ADDITIONAL FUNDING FOR IGUANA TRAPPING SERVICES IN THE AMOUNT OF $15,000 FOR THE REMAINDER OF FY 2019 BY USING GENERAL FUND CONTINGENCY |
Tue 2/19/19 |
Link |
2019-14 |
APPROVING AND AUTHORIZING THE EXECUTION OF A MUTUAL AID AGREEMENT FOR PROVIDING AND RECEIVING EMERGENCY ASSISTANCE FROM OTHER WATER/WASTEWATER UTILITIES |
Mon 3/4/19 |
Link |
2019-13 |
PROVIDING FOR RATIFICATION OF THE COLLECTIVE BARGAINING AGREEMENT BETWEEN LOCAL #2887, INTERNATIONAL ASSOCIATION OF FIREFIGHTERS AND THE CITY OF MARCO ISLAND, IN EFFECT FROM OCTOBER 1, 2018 THROUGH MARCH 31, 2021 |
Tue 2/19/19 |
Link |
2019-12 |
AUTHORIZING A CONSTRUCTION CONTRACT WITH ELI CONTRACTING, INC. IN AN AMOUNT NOT TO EXCEED $224,285.63 FOR THE SHADOW RIDGE COURT STORM DRAIN SYSTEM REPAIR PROJECT |
Tue 2/19/19 |
Link |
2019-11 |
AUTHORIZING A CONSTRUCTION CONTRACT WITH ELI CONTRACTING, INC. IN AMOUNT NOT TO EXCEED $295,305.27 FOR RELOCATION OF THE CITY OF MARCO ISLAND WATER & SEWER IMPROVEMENTS LOCATED WITHIN THE COLLIER BLVD. RIGHT OF WAY NORTH OF JUDGE S.S. JOLLEY BRIDGE |
Mon 2/4/19 |
Link |
2019-11 |
AUTHORIZING A CONSTRUCTION CONTRACT WITH ELI CONTRACTING, INC. IN AMOUNT NOT TO EXCEED $295,305.27 FOR RELOCATION OF THE CITY OF MARCO ISLAND WATER & SEWER IMPROVEMENTS WITHIN THE COLLIER BLVD. RIGHT OF WAY NORTH OF THE JUDGE S.S. JOLLEY BRIDGE |
Mon 2/4/19 |
Link |
2019-10 |
ACCEPTING THE RANKING AND RECOMMENDATION OF THE CITY’S SCORING COMMITTEE FOR THE DESIGN SERVICES FOR FIRE STATION #50; AUTHORIZING THE CITY MANAGER TO NEGOTIATE A CONTRACT WITH THE TOP RANKED FIRM BSSW ARCHITECTS, INC. |
Mon 2/4/19 |
Link |
2019-09 |
APPROVING A BOAT DOCK EXTENSION AT LOT 3, BLOCK 25, MARCO BEACH UNIT ONE, PLAT BOOK 6, PAGES 9 THROUGH 16, PUBLIC RECORDS OF COLLIER COUNTY, FLORIDA, LOCATED AT 1389 N COLLIER BOULEVARD |
Fri 2/1/19 |
Link |
2019-08 |
APPROVING THE AWARD OF A CONSTRUCTION CONTRACT TO PBS CONTRACTORS, LLC, FOR THE LIME SLUDGE PRESS BUILDING RESTORATION AT THE NORTH WATER TREATMENT PLANT |
Tue 1/22/19 |
Link |
2019-07 |
AUTHORIZING A PURCHASE ORDER TO THE VENDOR C.A.P. GOVERNMENT, INC., IN THE AMOUNT OF $112,500.00 FOR BUILDING INSPECTION SERVICES |
Tue 1/22/19 |
Link |
2019-06 |
APPROVING A CONTRACT WITH CAVACHE, INC. FOR THE 2019 HIDEAWAY BEACH EROSION CONTROL PROJECT |
Tue 1/22/19 |
Link |
2019-05 |
APPOINTING MEMBERS TO THE MARCO ISLAND PLANNING BOARD, WATERWAYS ADVISORY COMMITTEE, PARKS AND RECREATION ADVISORY COMMITTEE, BEAUTIFICATION ADVISORY COMMITTEE AND BEACH AND COASTAL RESOURCES ADVISORY COMMITTEE |
Mon 2/4/19 |
Link |
2019-04 |
PURCHASE OF REVERSE OSMOSIS (RO) MEMBRANES FOR THE SOUTH WATER TREATMENT PLANT FOR FISCAL YEARS (FY) 2019, 2020, AND 2021 |
Tue 1/22/19 |
Link |
2019-03 |
APPROVING AMENDMENTS TO THE CITY OF MARCO ISLAND CONSTRUCTION STANDARDS HANDBOOK FOR WORK WITHIN THE PUBLIC RIGHT-OF-WAY |
Mon 1/7/19 |
Link |
2019-02 |
APPROVING A CONDITIONAL USE FOR A GUESTHOUSE AT 880 SEAGRAPE DRIVE |
Mon 1/7/19 |
Link |
2019-01 |
APPROVING A VARIANCE TO ALLOW FOR A GUESTHOUSE ON LESS THAN A ONE (1) ACRE LOT; MAKING FINDINGS; APPROVING A VARIANCE FOR THE SUBJECT PROPERTY, LOCATED AT 880 SEAGRAPE DRIVE |
Mon 1/7/19 |
Link |
2018-95 |
APPOINTING MR. DAVID CRAIN TO THE WATERWAYS ADVISORY COMMITTEE |
Mon 12/10/18 |
Link |
2018-94 |
VARIANCE PETITION 18-004312 TO INCREASE BUILDING MAXIMUM HEIGHT REQUIREMENT OF 30 FEET FOR MARCO ISLAND ACADEMY AT 2255 SAN MARCO ROAD |
Mon 12/10/18 |
Link |
2018-93 |
VARIANCE PETITION 18-004268 REQUESTING REDUCING FRONT AND SIDE SETBACKS FOR THE PROPOSED ROOKERY BAY GOODLAND FIELD STATION LOCATED AT 2561 SAN MARCO ROAD |
Mon 12/10/18 |
Link |
2018-92 |
SITE DEVELOPMENT PLAN 17-003269 FOR AN AMENDMENT TO THE EXISTING SITE DEVELOPMENT PLAN FOR PUBLIX AND SHOPS OF MARCO LOCATED AT 175 S. BARFIELD DRIVE |
Mon 12/10/18 |
Link |
2018-91 |
SITE DEVELOPMENT PLAN 18-004313 FOR THE REDEVELOPMENT OF MARCO ISLAND ACADEMY AT THE LOCATION OF 2255 SAN MARCO ROAD |
Mon 12/10/18 |
Link |
2018-90 |
Site Development SITE DEVELOPMENT PLAN 18-005453 FOR THE CONSTRUCTION OF A NEW FIELD STATION (GOODLAND FIELD STATION) AT THE LOCATION OF 2561 SAN MARCO ROAD |
Mon 12/10/18 |
Link |
Parks & Recreation Facebook MIPD Facebook
Fire Rescue Twitter
Parks & Recreation Twitter
Marco Island Police Twitter