West Winterberry Dr. Bridge

Project Description:

Design and Construction of a new West Winterberry Dr. Bridge.

The Scope of Work includes plans and specifications for the removal and disposal of the superstructure and substructure of the existing multi-span concrete bridge, design of a single span replacement bridge, removal and replacement of City owned utility lines currently attached to the existing structure, design of new seawalls under and adjacent to the existing structure, design of retaining wall systems to raise the roadway approaches, design of storm drain systems in accordance with current City of Marco Island Stormwater Ordinance, design for the removal and reconstruction of new approach roads with sidewalks in accordance with current ADA standards and the design of potential scour protection measures, installation of navigation lights and landscape and hardscape amenities.

February 2024 - Bids Open

March 2024 - Award Construction Contract

May 2024 through November 2025 - Construction (Date range subject to change.)